Lecture Room Setup 2.0
In 2025, we finally updated our lecture room sets (aka. “cases”) to a new concept. See Case 2.0 for motivation and design decisions.
Each room setup now consist of two TRANSflex road cases with rack modules for key components.
Both road cases fit on a euro pallet when tipped on their short side. So during transport each lecture room will occupy 120×80 cm (height approx. 140 cm) and during operation 2x 120x60cm are needed (height approx. 80cm).
Usage
TODO: Revise signal diagram and add buildup instructions:
Case A
Contains the modules as well as the camera, mixer laptop, microphones and TODO. TODO: Picture
Case B
Contains accessories like:
tripod
cable mats
etc.
Assembly
FOH Module
Custom builds:
Steps:
Put cage nuts in rack rails:
Mount PoE-Switch and SDI Audio De-Embedder on short rack shelf
Modify d-norm rack panel to fit TRUE1 connector (add additional hole)
Connect power distribution panel to TRUE1 connector (solder or crimp connectors)
Place remaining items on back and front
Connect ethernet and SDI cables
Connect 6.3mm jack cables to audio outputs 1 and 2 of the SDI Audio De-Embedder
Connect 1m XLR (f) to angled XLR (m) cables to the 4 audio outputs of the wireless receiver
Place audio mixer on the top, connect 4 microphone and 2 SDI channels to inputs 1-6
Connect 6.3mm jacks (from the d-norm XLR outputs) to aux channels 1-6 of the audio mxier
Screw down remaining rack panels
Items:
Lectern Module
Custom builds:
Steps:
Preparation:
Put 16 cage nuts in the rack rails (2 rack units at the front and back)
Mount ethernet switch on rack shelf (double-sided tape) leaving 1 cm to the left side
Connect ethernet cables (to I/O panel) and dress them into a wire harness (TODO: upload picture):
TODO: Mount power supply on rack tray and connect to ethernet switch
Remove rack drawer from its rails and put devices on it using double-sided tape:
Mount ATEM Mini centered on right at the front edge
Mount Raspberry Pi on the left so that HDMI still goes past the ATEM mini
Mount Up-Down-Cross on right side with SDI pointing to the front and bottom side up (this way the DIP switches will still be accessible)
Place HDMI-Splitter at the back in a way that cables run fine
Connect cables running on the sliding tray:
0.5m HDMI from Raspberry Pi to ATEM Mini, Input 4
0.5m HDMI from ATEM Mini Output to HDMI splitter
0.5m HDMI from HDMI splitter to Up-Down-Cross
Connect cables running from drawer to I/O panel and dress them into a wire harness

3x 1.5m HDMI to ATEM inputs 1-3
1x 1.5m HDMI from HDMI splitter
1x 1.5m Ethernet from Raspberry Pi
1x 1.5m Ethernet from ATEM Mini
1x 1.0m SDI from Up-Down-Cross
1x 1.5m 3.5mm Jack to Cinch (d-norm, see above)
TODO: Power (don't connect to power supply yet)
Connect wire harness to I/O d-norm panel (but don't connect ethernet to the switch yet)
Now you'll have two parts: The drawer connected to the I/O panel with HDMI, SDI and audio as well as the rack tray with the ethernet switch 
Assembly:
Adjust the length of the rack drawer rails and mount them in the top rack unit
Slide in the drawer:
Slide in the rack tray with the switch:
screw down at lower rack unit at the back of the rack module
make sure, that the wire harness coming from the rack drawer is fully at the right side of the switch (when looking from the back of the rack module)
connect 12V power cable from wire harness to power supply
Connect I/O panel